HIGHLIGHTS
|
TORONTO, Nov. 24, 2026 (GLOBE NEWSWIRE) — Osisko Gold Group Inc. (NYSE: OGG, TSXV: OGG) (“Osisko Gold” or the “Company“) is pleased to announce new results from 11,059 metres (“m“) of exploration diamond drilling in 37 holes targeting the down-dip extension of the Lowhee Zone (“Lowhee Deep“) and its southeast lateral strike extension on Barkerville Mountain (“Lowhee SE“). Drilling was conducted from the 1260 m underground level in the Lowhee Zone and from surface on Barkerville Mountain at the Company’s flagship, 100%-owned Cariboo Gold Project (the “Project“), currently under construction in central British Columbia, Canada.
Chris Lodder, President, commented:
“Leveraging available underground drill bays and deeper drilling from surface, recent exploration results continue to highlight the near-mine resource growth potential of the Lowhee Zone, both laterally along strike and at depth. Drilling intersected high-grade gold mineralization over significant widths immediately along strike of the Cariboo deposit, in areas where few vein corridors have been modelled. At depth, hole BM-26-002 intersected significant gold mineralization more than 250 metres below modelled mineral resources. These results underscore the importance of continued exploration in underexplored areas, expanding our understanding of the geological model and identifying opportunities for future resource growth.”
Corporate Update
- The Company also announces that David Rouleau, Vice President, Project Development, intends to retire from his role effective January 1, 2027. Mr. Rouleau will continue to serve the Company in an advisory capacity throughout 2027. “On behalf of the Board and management, I would like to thank Dave for his many contributions to the progress of the Cariboo Gold Project. We are grateful for his commitment over the years and will continue to benefit from his guidance as he transitions into retirement,” said Sean Roosen, Chairman and CEO.
- The Company also appointed Facundo Meyniel as Vice President, Finance, effective November 24, 2026, who joins from PricewaterhouseCoopers LLP (PwC Canada), where he spent more than 15 years auditing publicly listed mining companies.
DRILL ASSAY HIGHLIGHTS
This news release contains assays from 37 diamond drillholes (“DD“) completed from both surface and underground (“UG“) totaling 11,059 m. Underground drilling toward the southeast from the L1260-ORE-002-DBY-002 and L1260-RMK-01 drill stations totalled 6,620 m in 29 drillholes with depths ranging from 57.2 to 546.35 m. A total of 4,439 m in 8 drillholes ranging from 361 to 897 m in length were completed from surface toward the northwest from various collars in the Lowhee SE extension zone on Barkerville Mountain (see Tables 3 and 4, and Figures 3-5). All drillholes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advancing or implement directional drilling (surface DD only). Available tooling for directional drilling requires advancing in NQ with a BQ (36.5 millimetre diameter) output while steering is active. Select fire assay highlights from intercepts outside the current mineral resource footprint include:
-
104.14 grams per tonne (“g/t”) gold (“Au”) over 1.50 m at ~600 m vertical depth in BM-26-002 including:
-
- 312.00 g/t Au over 0.50 m
-
-
16.08 g/t Au over 4.55 m at ~325 m vertical depth in BMU-26-057 including:
-
- 4.88 g/t Au over 0.50 m and,
- 60.70 g/t Au over 0.75 m and,
- 45.30 g/t Au over 0.50 m
-
-
17.53 g/t Au over 4.15 m at ~344 m vertical depth in BMU-26-057 including:
-
- 6.02 g/t Au over 0.50 m and,
- 63.30 g/t Au over 1.00 m and,
- 9.38 g/t Au over 0.50 m
-
-
11.07 g/t Au over 6.35 m at ~244 m vertical depth in BMU-26-085 including:
-
- 15.15 g/t Au over 0.50 m and,
- 29.30 g/t Au over 0.50 m and,
- 85.20 g/t Au over 0.50 m and,
- 6.84 g/t Au over 0.50 m
-
- 75.80 g/t Au over 0.50 m at ~183 m vertical depth in BMU-26-103
- 65.40 g/t Au over 0.50 m at ~196 m vertical depth in BM-26-005
-
22.65 g/t Au over 1.10 m at ~210 m vertical depth in BMU-26-089 including:
-
- 41.40 g/t Au over 0.60 m
-
-
6.12 g/t Au over 3.70 m at ~195 m vertical depth in BMU-26-087 including:
-
- 27.10 g/t Au over 0.50 m and,
- 3.24 g/t Au over 0.50 m and,
- 7.43 g/t Au over 1.00 m
-
-
12.51 g/t Au over 1.70 m at ~224 m vertical depth in BMU-26-091 including:
-
- 15.10 g/t Au over 0.60 m and,
- 12.90 g/t Au over 0.50 m and,
- 9.59 g/t Au over 0.60 m
-
-
10.39 g/t Au over 2.00 m at ~198 m vertical depth in BMU-26-106 including:
-
- 1.99 g/t Au over 0.50 m and,
- 37.40 g/t Au over 0.50 m
-
Complete assay highlights including true width estimates and vertical depths are provided in Tables 1 and 2 for intercepts inside and outside of the current mineral resource, respectively. Vertical depths are estimated as the distance from the modelled topographic surface to the interval mid-point. Drill hole locations and orientations are presented in Tables 3 and 4 for surface and underground collars, respectively. Core intervals not recovered were assigned zero grade. Top cuts have not been applied to high-grade assays.
Cut-off assay composites and individual samples including callouts to highlights above are presented in plan view in Figure 4, and in long section in Figure 5.
FIGURE 1: 104.14 g/t Au at 600 m vertical depth in BM-26-002; “Axial Planar” quartz vein hosted and vein halo mineralization.
FIGURE 2: 11.07 g/t Au over 6.35 m at ~244 m vertical depth in BMU-26-085; “Axial Planar” quartz vein hosted and associated high-grade replacement-style mineralization.
FIGURE 3: Cariboo Gold Project deposit map with Location of Lowhee Zone and Cow Portal underground access.
FIGURE 4: Lowhee Southeast / Lowhee Deep surface and underground exploration drilling highlights in plan
FIGURE 5: Lowhee Southeast and Deep surface and underground exploration drilling highlights in section
|
Table 1: Length weighted assay composites and individual samples>=1.8 g/t for Lowhee underground Exploration DD within the footprint of the current mineral resource |
|||||||
| Drillhole ID | From (m) | To (m) | Length (m) | Au g/t | Est. True Width (m) | Approx. Vertical Depth (m) | |
| BMU-26-048 | 10.10 | 10.60 | 0.50 | 3.10 | 0.43 | 192 | |
| 25.60 | 26.10 | 0.50 | 3.57 | 0.48 | 196 | ||
| BMU-26-051 | 4.50 | 5.00 | 0.50 | 1.82 | 0.45 | 190 | |
| 14.20 | 14.70 | 0.50 | 4.20 | 0.45 | 196 | ||
| BMU-26-054 | 19.90 | 20.90 | 1.00 | 2.01 | 0.71 | 203 | |
| BMU-26-063 | 2.90 | 3.50 | 0.60 | 2.57 | 0.49 | 180 | |
| 6.00 | 8.40 | 2.40 | 1.80 | 2.36 | 181 | ||
| Including | 6.00 | 6.50 | 0.50 | 8.16 | 0.49 | ||
| BMU-26-064 | 0.90 | 2.50 | 1.60 | 2.01 | 1.13 | 185 | |
| Including | 0.90 | 1.40 | 0.50 | 5.74 | 0.35 | ||
| 5.20 | 6.20 | 1.00 | 2.43 | 0.87 | 184 | ||
| Including | 5.70 | 6.20 | 0.50 | 4.64 | 0.43 | ||
| 39.70 | 40.80 | 1.10 | 3.19 | 1.00 | 172 | ||
| Including | 39.70 | 40.30 | 0.60 | 5.72 | 0.54 | ||
| 46.85 | 47.60 | 0.75 | 26.00 | 0.57 | 170 | ||
| 54.60 | 56.00 | 1.40 | 4.19 | 0.95 | 168 | ||
| Including | 55.40 | 56.00 | 0.60 | 9.09 | 0.41 | ||
| BMU-26-066 | 4.70 | 5.75 | 1.05 | 2.56 | 1.01 | 182 | |
| Including | 5.20 | 5.75 | 0.55 | 4.58 | 0.55 | ||
| 7.35 | 9.30 | 1.95 | 2.11 | 1.75 | 183 | ||
| Including | 7.85 | 8.35 | 0.50 | 7.44 | 0.48 | ||
| 14.10 | 17.00 | 2.90 | 2.29 | 2.51 | 186 | ||
| Including | 14.10 | 14.60 | 0.50 | 5.94 | 0.43 | ||
| and | 16.20 | 17.00 | 0.80 | 4.21 | 0.69 | ||
| BMU-26-068 | 1.25 | 1.75 | 0.50 | 2.73 | 0.35 | 178 | |
| 2.25 | 2.85 | 0.60 | 2.18 | 0.49 | 177 | ||
| 5.50 | 6.00 | 0.50 | 7.18 | 0.32 | 176 | ||
| BMU-26-071 | 63.10 | 63.60 | 0.50 | 17.05 | 0.29 | 175 | |
| 126.90 | 128.00 | 1.10 | 2.26 | 0.78 | 157 | ||
| Including | 127.40 | 128.00 | 0.60 | 3.22 | 0.42 | ||
| 133.00 | 133.50 | 0.50 | 6.31 | 0.35 | 154 | ||
| BMU-26-082 | 0.00 | 7.70 | 7.70 | 3.52 | 6.31 | 179 | |
| Including | 0.00 | 0.50 | 0.50 | 2.31 | |||
| and | 1.80 | 2.50 | 0.70 | 6.16 | 0.57 | ||
| and | 3.35 | 3.85 | 0.50 | 19.65 | 0.38 | ||
| and | 3.85 | 4.50 | 0.65 | 9.41 | |||
| and | 5.70 | 6.20 | 0.50 | 5.46 | |||
| and | 7.20 | 7.70 | 0.50 | 5.03 | 0.43 | ||
| BMU-26-083 | 4.05 | 5.05 | 1.00 | 6.38 | 0.77 | 177 | |
| BMU-26-084 | 1.50 | 3.70 | 2.20 | 2.05 | 1.69 | 179 | |
| Including | 1.50 | 2.00 | 0.50 | 3.64 | 0.43 | ||
| 19.00 | 21.50 | 2.50 | 1.86 | 2.05 | 176 | ||
| Including | 20.00 | 21.00 | 1.00 | 3.85 | 0.82 | ||
| 24.50 | 26.00 | 1.50 | 7.21 | 1.15 | 175 | ||
| Including | 24.50 | 25.00 | 0.50 | 18.95 | 0.38 | ||
| and | 25.00 | 25.50 | 0.50 | 1.82 | |||
| 52.10 | 52.60 | 0.50 | 2.34 | 0.32 | 171 | ||
| BMU-26-085 | 5.50 | 9.60 | 4.10 | 2.74 | 4.00 | 185 | |
| Including | 5.50 | 6.00 | 0.50 | 2.02 | 0.49 | ||
| and | 8.70 | 9.60 | 0.90 | 9.64 | 0.87 | ||
| BMU-26-086 | 3.60 | 8.20 | 4.60 | 3.11 | 4.37 | 185 | |
| Including | 3.60 | 4.10 | 0.50 | 5.82 | 0.43 | ||
| and | 5.70 | 6.20 | 0.50 | 3.01 | 0.50 | ||
| and | 7.20 | 7.70 | 0.50 | 12.85 | 0.47 | ||
| and | 7.70 | 8.20 | 0.50 | 5.18 | |||
| 11.60 | 15.30 | 3.70 | 2.71 | 2.73 | 190 | ||
| Including | 11.60 | 12.10 | 0.50 | 18.60 | 0.43 | ||
| BMU-26-087 | 4.10 | 4.60 | 0.50 | 8.93 | 0.47 | 185 | |
| 6.70 | 7.20 | 0.50 | 21.10 | 0.41 | 187 | ||
| BMU-26-088 | 16.60 | 17.30 | 0.70 | 2.52 | 0.66 | 183 | |
| BMU-26-089 | 15.30 | 15.90 | 0.60 | 11.30 | 0.56 | 186 | |
| 18.60 | 19.60 | 1.00 | 1.98 | 1.00 | 187 | ||
| Including | 18.60 | 19.10 | 0.50 | 3.84 | 0.50 | ||
| BMU-26-090 | 5.70 | 7.30 | 1.60 | 3.05 | 1.55 | 185 | |
| Including | 6.80 | 7.30 | 0.50 | 7.60 | 0.47 | ||
| 15.30 | 16.30 | 1.00 | 2.41 | 0.94 | 189 | ||
| 25.00 | 25.50 | 0.50 | 4.53 | 0.43 | 194 | ||
| BMU-26-091 | 5.80 | 8.70 | 2.90 | 6.81 | 2.63 | 186 | |
| Including | 5.80 | 6.30 | 0.50 | 24.70 | 0.45 | ||
| and | 8.20 | 8.70 | 0.50 | 13.90 | 0.29 | ||
| 17.70 | 19.30 | 1.60 | 52.75 | 1.13 | 193 | ||
| Including | 17.70 | 18.30 | 0.60 | 139.50 | 0.42 | ||
| BMU-26-092 | 6.50 | 7.50 | 1.00 | 6.80 | 0.82 | 187 | |
| Including | 6.50 | 7.00 | 0.50 | 13.40 | 0.41 | ||
| 9.00 | 10.10 | 1.10 | 16.44 | 1.00 | 189 | ||
| Including | 9.00 | 9.55 | 0.55 | 25.70 | 0.50 | ||
| and | 9.55 | 10.10 | 0.55 | 7.17 | |||
| 17.40 | 19.90 | 2.50 | 5.80 | 2.27 | 196 | ||
| Including | 17.90 | 18.40 | 0.50 | 24.50 | 0.43 | ||
| and | 18.90 | 19.40 | 0.50 | 3.06 | 0.47 | ||
| BMU-26-103 | 3.50 | 5.60 | 2.10 | 2.30 | 1.72 | 187 | |
| Including | 4.10 | 4.60 | 0.50 | 8.27 | 0.41 | ||
| 115.10 | 115.60 | 0.50 | 25.70 | 0.48 | 180 | ||
| 124.40 | 125.90 | 1.50 | 36.73 | 1.30 | 179 | ||
| Including | 124.40 | 124.90 | 0.50 | 110.00 | 0.43 | ||
| BMU-26-104 | 27.80 | 28.30 | 0.50 | 3.42 | 0.47 | 191 | |
| BMU-26-105 | 16.90 | 19.75 | 2.85 | 3.71 | 2.58 | 180 | |
| Including | 18.55 | 19.15 | 0.60 | 13.70 | 0.54 | ||
| BMU-26-106 | 25.40 | 25.90 | 0.50 | 1.90 | 0.45 | 185 | |
| BMU-26-107 | 0.50 | 1.35 | 0.85 | 2.58 | 0.84 | 181 | |
| 11.40 | 11.90 | 0.50 | 6.69 | 0.47 | 185 | ||
| 15.00 | 15.50 | 0.50 | 8.51 | 0.50 | 186 | ||
| 26.75 | 27.25 | 0.50 | 2.25 | 0.43 | 190 | ||
| BMU-26-108 | 3.00 | 3.50 | 0.50 | 5.39 | 0.43 | 183 | |
| 6.50 | 7.00 | 0.50 | 2.84 | 0.49 | 185 | ||
| 11.10 | 11.60 | 0.50 | 2.63 | 0.40 | 187 | ||
| 15.30 | 16.80 | 1.50 | 2.79 | 1.41 | 189 | ||
| Including | 15.30 | 15.80 | 0.50 | 8.11 | 0.47 | ||
| 18.50 | 19.00 | 0.50 | 2.48 | 0.43 | 190 | ||
| 30.35 | 30.95 | 0.60 | 3.08 | 0.39 | 196 | ||
| BMU-26-109 | 17.00 | 18.00 | 1.00 | 27.81 | 0.77 | 192 | |
| Including | 17.00 | 17.50 | 0.50 | 54.50 | 0.38 | ||
| 25.00 | 25.50 | 0.50 | 6.51 | 0.45 | 197 | ||
| 35.00 | 36.00 | 1.00 | 4.63 | 0.64 | 204 | ||
| Including | 35.00 | 35.50 | 0.50 | 7.73 | 0.32 | ||
| 52.00 | 53.15 | 1.15 | 7.06 | 1.15 | 216 | ||
| Including | 52.00 | 52.65 | 0.65 | 12.30 | 0.65 | ||
| BMU-26-110 | 5.75 | 6.25 | 0.50 | 9.39 | 0.43 | 186 | |
| 19.10 | 19.60 | 0.50 | 5.39 | 0.47 | 197 | ||
| 22.25 | 22.75 | 0.50 | 13.50 | 0.47 | 199 | ||
| 47.90 | 49.90 | 2.00 | 8.94 | 1.91 | 220 | ||
| Including | 47.90 | 48.40 | 0.50 | 25.00 | |||
| and | 48.40 | 48.90 | 0.50 | 10.00 | 0.48 | ||
| 51.20 | 52.20 | 1.00 | 1.94 | 0.99 | 222 | ||
| Including | 51.70 | 52.20 | 0.50 | 3.71 | 0.50 | ||
| 57.10 | 57.60 | 0.50 | 4.45 | 0.45 | 227 | ||
|
Table 2: Length weighted assay composites and individual samples>=1.8 g/t for Lowhee underground and Lowhee SE / Lowhee Deep Surface Exploration DD outside the footprint of the current mineral resource |
|||||||
| Drillhole ID | From (m) | To (m) | Length (m) | Au g/t | Est. True Width (m) | Approx. Vertical Depth (m) | |
| BM-26-001 | 362.50 | 365.00 | 2.50 | 3.54 | 1.92 | 190 | |
| Including | 363.65 | 365.00 | 1.35 | 6.18 | |||
| 432.10 | 434.70 | 2.60 | 2.26 | 1.84 | 229 | ||
| Including | 432.10 | 432.90 | 0.80 | 2.07 | 0.61 | ||
| and | 432.90 | 433.40 | 0.50 | 6.42 | 0.32 | ||
| 437.10 | 437.60 | 0.50 | 2.11 | 0.38 | 231 | ||
| 445.80 | 446.30 | 0.50 | 2.88 | 0.32 | 236 | ||
| 484.60 | 486.15 | 1.55 | 6.93 | 1.1 | 257 | ||
| Including | 484.60 | 485.20 | 0.60 | 10.9 | 0.42 | ||
| and | 485.20 | 486.15 | 0.95 | 4.42 | 0.67 | ||
| 562.55 | 563.15 | 0.60 | 2.45 | 0.46 | 275 | ||
| 667.50 | 669.20 | 1.70 | 11.34 | 1.15 | 304 | ||
| Including | 667.50 | 668.20 | 0.70 | 24.6 | 0.54 | ||
| and | 668.70 | 669.20 | 0.50 | 4.04 | 0.29 | ||
| BM-26-002 | 321.00 | 322.00 | 1.00 | 2.65 | 0.26 | 251 | |
| 506.00 | 508.00 | 2.00 | 4.25 | 1.35 | 372 | ||
| Including | 506.00 | 507.00 | 1.00 | 6.55 | 0.57 | ||
| and | 507.50 | 508.00 | 0.50 | 3.62 | 0.38 | ||
| 545.65 | 546.30 | 0.65 | 2.5 | 0.46 | 394 | ||
| 678.50 | 679.00 | 0.50 | 4.57 | 0.38 | 488 | ||
| 826.15 | 827.65 | 1.50 | 104.14 | 0.86 | 600 | ||
| Including | 826.65 | 827.15 | 0.50 | 312 | 0.29 | ||
| BM-26-003 | No significant Assays | ||||||
| BM-26-004 | 26.00 | 26.50 | 0.50 | 3.73 | 0.32 | 17 | |
| 110.10 | 111.20 | 1.10 | 2.25 | 0.55 | 69 | ||
| Including | 110.10 | 110.60 | 0.50 | 3.49 | 0.25 | ||
| 139.85 | 140.35 | 0.50 | 12.3 | 0.32 | 89 | ||
| 141.90 | 142.60 | 0.70 | 28.3 | 0.4 | 90 | ||
| 300.85 | 301.35 | 0.50 | 1.9 | 0.35 | 195 | ||
| 319.45 | 319.95 | 0.50 | 65.4 | 0.35 | 196 | ||
| BM-26-005 | 495.30 | 496.00 | 0.70 | 1.9 | 0.57 | 305 | |
| BM-26-006 | 103.00 | 103.50 | 0.50 | 1.84 | 0.38 | 57 | |
| 112.50 | 115.50 | 3.00 | 2.11 | 1.5 | 63 | ||
| Including | 112.50 | 113.25 | 0.75 | 5.63 | |||
| and | 114.10 | 115.00 | 0.90 | 2.04 | 0.45 | ||
| BM-26-007 | No significant Assays | ||||||
| BM-26-008 | No significant Assays | ||||||
| BMU-26-048 | 137.10 | 137.60 | 0.50 | 4.68 | 0.48 | 228 | |
| 140.00 | 142.50 | 2.50 | 2.72 | 2.35 | 228 | ||
| Including | 142.00 | 142.50 | 0.50 | 11.65 | 0.48 | ||
| 148.00 | 148.50 | 0.50 | 1.94 | 0.48 | 230 | ||
| 248.55 | 249.55 | 1.00 | 2.21 | 0.97 | 241 | ||
| Including | 248.55 | 249.05 | 0.50 | 4.22 | 0.48 | ||
| BMU-26-051 | 35.85 | 36.35 | 0.50 | 2.92 | 0.49 | 206 | |
| 40.40 | 40.90 | 0.50 | 2.03 | 0.47 | 208 | ||
| 48.00 | 49.00 | 1.00 | 3.5 | 0.98 | 212 | ||
| 50.90 | 51.50 | 0.60 | 11.6 | 0.52 | 214 | ||
| 80.35 | 80.85 | 0.50 | 2.57 | 0.44 | 229 | ||
| 85.00 | 85.50 | 0.50 | 3.33 | 0.44 | 232 | ||
| 87.50 | 94.80 | 7.30 | 2.83 | 6.57 | 235 | ||
| Including | 87.50 | 88.00 | 0.50 | 9 | 0.41 | ||
| and | 89.75 | 90.25 | 0.50 | 5.91 | 0.45 | ||
| and | 90.25 | 90.75 | 0.50 | 10.8 | 0.45 | ||
| and | 91.75 | 92.25 | 0.50 | 3.63 | 0.45 | ||
| and | 94.25 | 94.80 | 0.55 | 6.49 | 0.52 | ||
| 97.30 | 98.75 | 1.45 | 4.77 | 1.26 | 238 | ||
| Including | 97.30 | 98.00 | 0.70 | 3.12 | 0.61 | ||
| and | 98.00 | 98.75 | 0.75 | 6.31 | 0.65 | ||
| 120.20 | 120.70 | 0.50 | 2.52 | 0.45 | 248 | ||
| 267.00 | 268.00 | 1.00 | 2.12 | 0.77 | 308 | ||
| Including | 267.00 | 267.50 | 0.50 | 3.99 | 0.38 | ||
| 354.00 | 355.50 | 1.50 | 1.94 | 1.41 | 347 | ||
| Including | 354.00 | 355.00 | 1.00 | 2.3 | 0.94 | ||
| 396.95 | 397.95 | 1.00 | 11.3 | 0.87 | 364 | ||
| BMU-26-054 | 89.00 | 92.30 | 3.30 | 2.59 | 2.81 | 246 | |
| Including | 89.00 | 89.60 | 0.60 | 3.71 | 0.52 | ||
| and | 90.10 | 90.80 | 0.70 | 5.63 | 0.57 | ||
| and | 90.80 | 91.30 | 0.50 | 2.06 | 0.43 | ||
| 112.00 | 116.00 | 4.00 | 3.68 | 3.63 | 261 | ||
| Including | 112.00 | 112.85 | 0.85 | 2.47 | 0.74 | ||
| and | 112.85 | 113.35 | 0.50 | 5.01 | 0.47 | ||
| and | 113.85 | 114.85 | 1.00 | 9.51 | 0.77 | ||
| 140.00 | 140.90 | 0.90 | 17.1 | 0.78 | 275 | ||
| 143.10 | 143.90 | 0.80 | 6.68 | 0.69 | 276 | ||
| BMU-26-057 | 41.75 | 43.35 | 1.60 | 2.58 | 1.5 | 220 | |
| Including | 41.75 | 42.75 | 1.00 | 4.07 | 0.94 | ||
| 96.00 | 99.90 | 3.90 | 1.86 | 3.32 | 262 | ||
| Including | 97.30 | 97.90 | 0.60 | 1.83 | 0.54 | ||
| and | 98.90 | 99.40 | 0.50 | 2.17 | 0.38 | ||
| and | 99.40 | 99.90 | 0.50 | 7.3 | 0.43 | ||
| 104.15 | 106.70 | 2.55 | 1.94 | 0.87 | 268 | ||
| Including | 104.15 | 105.00 | 0.85 | 5.08 | 0.29 | ||
| 139.50 | 141.00 | 1.50 | 2.04 | 1.49 | 294 | ||
| Including | 140.00 | 140.50 | 0.50 | 5.87 | 0.5 | ||
| 149.40 | 151.35 | 1.95 | 2.39 | 1.49 | 301 | ||
| Including | 149.90 | 150.65 | 0.75 | 4.38 | 0.57 | ||
| and | 150.65 | 151.35 | 0.70 | 1.85 | 0.54 | ||
| 186.45 | 191.00 | 4.55 | 16.08 | 4.04 | 325 | ||
| Including | 186.45 | 186.95 | 0.50 | 4.88 | 0.44 | ||
| and | 186.95 | 187.70 | 0.75 | 60.7 | 0.65 | ||
| and | 187.70 | 188.20 | 0.50 | 45.3 | 0.45 | ||
| 225.85 | 230.00 | 4.15 | 17.53 | 3.18 | 344 | ||
| Including | 226.35 | 226.85 | 0.50 | 6.02 | 0.38 | ||
| and | 226.85 | 227.85 | 1.00 | 63.3 | 0.77 | ||
| and | 227.85 | 228.35 | 0.50 | 9.38 | 0.39 | ||
| 335.00 | 337.00 | 2.00 | 8.32 | 1.29 | 402 | ||
| Including | 335.50 | 336.00 | 0.50 | 27.9 | 0.32 | ||
| and | 336.00 | 336.50 | 0.50 | 5.09 | 0.33 | ||
| BMU-26-060 | No significant Assays | ||||||
| BMU-26-064 | 74.90 | 77.55 | 2.65 | 5.13 | 1.92 | 163 | |
| Including | 74.90 | 75.40 | 0.50 | 2.82 | 0.37 | ||
| and | 76.60 | 77.55 | 0.95 | 12.75 | 0.67 | ||
| BMU-26-066 | 57.80 | 59.30 | 1.50 | 7.53 | 1.48 | 203 | |
| Including | 58.80 | 59.30 | 0.50 | 22.1 | 0.49 | ||
| BMU-26-071 | 179.60 | 180.10 | 0.50 | 6.92 | 0.42 | 136 | |
| 189.95 | 191.10 | 1.15 | 2.13 | 0.91 | 131 | ||
| Including | 190.60 | 191.10 | 0.50 | 4.73 | 0.39 | ||
| 209.30 | 209.80 | 0.50 | 4.2 | 0.38 | 122 | ||
| 244.00 | 244.60 | 0.60 | 2.14 | 0.46 | 107 | ||
| BMU-26-082 | 48.00 | 50.00 | 2.00 | 4.09 | 1.73 | 175 | |
| Including | 48.00 | 49.00 | 1.00 | 7.33 | 0.87 | ||
| BMU-26-085 | 27.00 | 28.50 | 1.50 | 1.84 | 1.48 | 195 | |
| Including | 27.00 | 27.50 | 0.50 | 4.53 | 0.49 | ||
| 75.30 | 77.30 | 2.00 | 9.73 | 1.76 | 221 | ||
| Including | 75.30 | 75.80 | 0.50 | 3.02 | 0.45 | ||
| and | 75.80 | 76.30 | 0.50 | 3.23 | 0.43 | ||
| and | 76.30 | 76.80 | 0.50 | 27.7 | 0.43 | ||
| and | 76.80 | 77.30 | 0.50 | 4.96 | |||
| 100.90 | 101.50 | 0.60 | 1.93 | 0.56 | 234 | ||
| 108.00 | 109.00 | 1.00 | 2.8 | 0.64 | 237 | ||
| Including | 108.00 | 108.50 | 0.50 | 5.14 | 0.32 | ||
| 120.35 | 126.70 | 6.35 | 11.07 | 5.2 | 244 | ||
| Including | 120.35 | 120.85 | 0.50 | 15.15 | 0.38 | ||
| and | 121.85 | 122.35 | 0.50 | 29.3 | |||
| and | 122.35 | 122.85 | 0.50 | 85.2 | 0.41 | ||
| and | 122.85 | 123.35 | 0.50 | 6.84 | |||
| BMU-26-086 | 17.30 | 18.30 | 1.00 | 8.36 | 0.97 | 193 | |
| Including | 17.30 | 17.80 | 0.50 | 13.7 | 0.47 | ||
| and | 17.80 | 18.30 | 0.50 | 3.01 | 0.49 | ||
| 39.30 | 39.80 | 0.50 | 1.93 | 0.21 | 207 | ||
| 99.70 | 100.70 | 1.00 | 9.29 | 0.79 | 247 | ||
| Including | 99.70 | 100.20 | 0.50 | 14.65 | 0.45 | ||
| and | 100.20 | 100.70 | 0.50 | 3.92 | 0.32 | ||
| 119.00 | 120.00 | 1.00 | 2.17 | 0.94 | 258 | ||
| BMU-26-087 | 15.20 | 18.90 | 3.70 | 6.12 | 3.07 | 195 | |
| Including | 15.20 | 15.70 | 0.50 | 27.1 | 0.38 | ||
| and | 16.20 | 16.70 | 0.50 | 3.24 | 0.44 | ||
| and | 17.90 | 18.90 | 1.00 | 7.43 | |||
| 21.75 | 22.25 | 0.50 | 13.8 | 0.43 | 198 | ||
| 31.40 | 33.40 | 2.00 | 4.42 | 1.75 | 206 | ||
| Including | 31.40 | 32.15 | 0.75 | 2.82 | 0.63 | ||
| and | 32.15 | 32.70 | 0.55 | 7.25 | 0.5 | ||
| and | 32.70 | 33.40 | 0.70 | 3.92 | |||
| 189.30 | 191.30 | 2.00 | 2.29 | 1.81 | 324 | ||
| Including | 189.30 | 189.80 | 0.50 | 7.51 | 0.45 | ||
| BMU-26-088 | 73.50 | 74.50 | 1.00 | 7.07 | 0.71 | 196 | |
| Including | 74.00 | 74.50 | 0.50 | 13.95 | 0.35 | ||
| BMU-26-089 | 74.40 | 75.50 | 1.10 | 22.65 | 1.06 | 210 | |
| Including | 74.40 | 75.00 | 0.60 | 41.4 | 0.58 | ||
| 104.00 | 105.00 | 1.00 | 2.55 | 0.94 | 220 | ||
| Including | 104.00 | 104.50 | 0.50 | 4.83 | 0.47 | ||
| BMU-26-090 | 54.00 | 54.70 | 0.70 | 2.26 | 0.45 | 210 | |
| 72.40 | 74.95 | 2.55 | 2.86 | 2.21 | 220 | ||
| Including | 74.45 | 74.95 | 0.50 | 12.25 | 0.43 | ||
| 91.40 | 92.10 | 0.70 | 1.97 | 0.61 | 228 | ||
| 96.50 | 98.00 | 1.50 | 2.94 | 1.41 | 231 | ||
| Including | 97.00 | 97.50 | 0.50 | 2.47 | 0.47 | ||
| and | 97.50 | 98.00 | 0.50 | 5.7 | |||
| 127.40 | 127.90 | 0.50 | 6.8 | 0.35 | 243 | ||
| BMU-26-091 | 37.00 | 37.50 | 0.50 | 2.03 | 0.47 | 205 | |
| 62.85 | 64.55 | 1.70 | 12.51 | 1.6 | 224 | ||
| Including | 62.85 | 63.45 | 0.60 | 15.1 | 0.56 | ||
| and | 63.45 | 63.95 | 0.50 | 12.9 | |||
| and | 63.95 | 64.55 | 0.60 | 9.59 | |||
| 86.00 | 92.10 | 6.10 | 2.86 | 4.5 | 240 | ||
| Including | 87.90 | 88.50 | 0.60 | 8.92 | 0.42 | ||
| and | 90.85 | 91.50 | 0.65 | 15.4 | 0.5 | ||
| 117.25 | 118.00 | 0.75 | 2.26 | 0.68 | 256 | ||
| 121.00 | 121.50 | 0.50 | 2.35 | 0.47 | 258 | ||
| 123.00 | 124.00 | 1.00 | 2.41 | 0.96 | 259 | ||
| Including | 123.50 | 124.00 | 0.50 | 4.63 | 0.5 | ||
| 154.00 | 154.65 | 0.65 | 2.06 | 0.56 | 277 | ||
| BMU-26-092 | 27.90 | 28.40 | 0.50 | 5.24 | 0.43 | 203 | |
| 49.95 | 50.45 | 0.50 | 1.86 | 0.38 | 221 | ||
| 60.70 | 61.20 | 0.50 | 3.46 | 0.38 | 230 | ||
| 97.80 | 98.30 | 0.50 | 2.16 | 0.41 | 259 | ||
| 143.75 | 144.25 | 0.50 | 2.26 | 0.43 | 295 | ||
| 238.50 | 239.00 | 0.50 | 3.16 | 0.38 | 363 | ||
| BMU-26-103 | 36.85 | 37.85 | 1.00 | 2.71 | 0.91 | 185 | |
| Including | 37.35 | 37.85 | 0.50 | 4.72 | 0.45 | ||
| 61.10 | 61.60 | 0.50 | 2.44 | 0.45 | 186 | ||
| 89.90 | 92.90 | 3.00 | 3.75 | 2.67 | 184 | ||
| Including | 89.90 | 90.40 | 0.50 | 10.55 | 0.35 | ||
| and | 90.40 | 90.90 | 0.50 | 2.48 | |||
| and | 91.90 | 92.40 | 0.50 | 2.9 | 0.45 | ||
| and | 92.40 | 92.90 | 0.50 | 5.98 | 0.49 | ||
| 99.05 | 99.55 | 0.50 | 75.8 | 0.44 | 183 | ||
| 111.35 | 111.85 | 0.50 | 2.63 | 0.43 | 181 | ||
| 140.95 | 142.35 | 1.40 | 7.56 | 1.07 | 176 | ||
| Including | 140.95 | 141.85 | 0.90 | 11.3 | 0.58 | ||
| BMU-26-104 | 49.00 | 50.00 | 1.00 | 2.59 | 0.77 | 194 | |
| 60.00 | 61.00 | 1.00 | 2.7 | 0.87 | 196 | ||
| 161.25 | 162.25 | 1.00 | 4.57 | 1 | 201 | ||
| Including | 161.25 | 161.75 | 0.50 | 8.02 | 0.5 | ||
| 227.20 | 227.70 | 0.50 | 4.98 | 0.43 | 201 | ||
| 310.55 | 311.20 | 0.65 | 2.43 | 0.63 | 203 | ||
| BMU-26-105 | 94.65 | 95.65 | 1.00 | 2.87 | 0.82 | 180 | |
| Including | 94.65 | 95.15 | 0.50 | 5.59 | 0.41 | ||
| BMU-26-106 | 57.25 | 58.25 | 1.00 | 2.67 | 0.96 | 192 | |
| Including | 57.75 | 58.25 | 0.50 | 4.79 | 0.48 | ||
| 92.85 | 94.35 | 1.50 | 3.12 | 1.48 | 198 | ||
| Including | 93.35 | 93.85 | 0.50 | 8.82 | 0.49 | ||
| 101.25 | 103.25 | 2.00 | 10.39 | 1.92 | 198 | ||
| Including | 101.25 | 101.75 | 0.50 | 1.99 | 0.48 | ||
| and | 101.75 | 102.25 | 0.50 | 37.4 | 0.48 | ||
| 107.00 | 107.50 | 0.50 | 3.08 | 0.47 | 199 | ||
| BMU-26-107 | 100.90 | 101.40 | 0.50 | 1.85 | 0.47 | 215 | |
| BMU-26-108 | 47.00 | 52.15 | 5.15 | 1.85 | 5.04 | 206 | |
| Including | 47.00 | 47.50 | 0.50 | 10.7 | 0.5 | ||
| and | 49.15 | 49.65 | 0.50 | 2 | |||
| and | 51.15 | 51.65 | 0.50 | 3.56 | |||
| 109.00 | 109.50 | 0.50 | 2.36 | 0.47 | 234 | ||
| BMU-26-109 | 43.80 | 44.40 | 0.60 | 3.58 | 0.56 | 210 | |
| 59.15 | 62.65 | 3.50 | 1.85 | 3.13 | 222 | ||
| Including | 59.15 | 59.65 | 0.50 | 6.66 | 0.43 | ||
| and | 59.65 | 60.15 | 0.50 | 3.73 | 0.43 | ||
| and | 62.15 | 62.65 | 0.50 | 2.24 | 0.47 | ||
| 74.30 | 76.00 | 1.70 | 4.24 | 1.64 | 232 | ||
| Including | 74.30 | 74.80 | 0.50 | 13.85 | 0.48 | ||
| 93.50 | 94.00 | 0.50 | 2.5 | 0.47 | 245 | ||
| 97.50 | 98.00 | 0.50 | 13.6 | 0.43 | 247 | ||
| 101.60 | 102.10 | 0.50 | 6.36 | 0.48 | 250 | ||
| 131.25 | 131.75 | 0.50 | 7.65 | 0.43 | 268 | ||
| 176.80 | 179.35 | 2.55 | 3.45 | 2.3 | 297 | ||
| Including | 176.80 | 177.30 | 0.50 | 14.25 | 0.43 | ||
| and | 177.80 | 178.35 | 0.55 | 2.62 | 0.51 | ||
| BMU-26-110 | 27.10 | 27.60 | 0.50 | 6.92 | 0.41 | 203 | |
| 95.80 | 96.30 | 0.50 | 3.68 | 0.37 | 258 | ||
| 119.20 | 119.70 | 0.50 | 3.4 | 0.43 | 277 | ||
| 122.45 | 122.95 | 0.50 | 3.02 | 0.44 | 279 | ||
| 131.50 | 132.25 | 0.75 | 3.17 | 0.57 | 286 | ||
| 135.95 | 136.45 | 0.50 | 2.09 | 0.46 | 290 | ||
| 143.90 | 144.40 | 0.50 | 2.84 | 0.41 | 295 | ||
| 243.15 | 243.70 | 0.55 | 3.58 | 0.39 | 371 | ||
| Table 3: Lowhee DE / Lowhee Deep Surface DD collar locations, drillhole orientations, and max depths. Negative dips point down. | ||||||
| Drillhole ID |
Easting (UTM Zn 10N) |
Northing (UTM Zn 10N) |
Elevation (m) | Dip | Azimuth | Depth (m) |
| BM-26-001 | 596906.1 | 5882523.5 | 1559.8 | -45 | 300 | 706 |
| BM-26-002 | 596906.2 | 5882522.6 | 1559.9 | -50 | 325 | 897 |
| BM-26-003 | 597065.3 | 5882407.3 | 1584.6 | -45 | 305 | 606 |
| BM-26-004 | 597058.8 | 5882053.9 | 1578.8 | -45 | 305 | 380 |
| BM-26-005 | 597030.9 | 5882188.9 | 1578.9 | -45 | 305 | 541 |
| BM-26-006 | 596977.3 | 5882103.3 | 1563.5 | -45 | 305 | 361 |
| BM-26-007 | 596983.7 | 5882464.0 | 1574.1 | -45 | 305 | 501 |
| BM-26-008 | 597043.2 | 5882547.7 | 1586.6 | -45 | 305 | 447 |
| Table 4: Lowhee Underground Exploration DD collar locations, drillhole orientations, and max depths. Negative dips point down. | |||||||
| Drillhole ID | Mine Location |
Easting (UTM Zn 10N) |
Northing (UTM Zn 10N) |
Elevation (m) | Dip | Azimuth | Depth (m) |
| BMU-26-048 | L1260-ORE-002-DBY-002 | 596554.0 | 5882794.3 | 1258.8 | -5 | 149 | 305.8 |
| BMU-26-051 | L1260-ORE-002-DBY-002 | 596554.0 | 5882794.1 | 1258.4 | -15 | 151 | 546.35 |
| BMU-26-054 | L1260-ORE-002-DBY-002 | 596554.3 | 5882793.7 | 1257.9 | -25 | 149 | 215.9 |
| BMU-26-057 | L1260-ORE-002-DBY-002 | 596553.8 | 5882794.1 | 1257.8 | -35 | 149 | 538.4 |
| BMU-26-060 | L1260-RMK-001 | 596552.5 | 5882850.7 | 1261.6 | 37 | 110 | 57.2 |
| BMU-26-063 | L1260-RMK-001 | 596553.0 | 5882851.1 | 1260.6 | 12 | 110 | 81.3 |
| BMU-26-064 | L1260-ORE-002-DBY-002 | 596553.6 | 5882794.8 | 1260.8 | 35 | 149 | 112.1 |
| BMU-26-066 | L1260-RMK-001 | 596552.9 | 5882851.2 | 1260.1 | -5 | 110 | 165.3 |
| BMU-26-068 | L1260-RMK-001 | 596552.3 | 5882850.8 | 1262.4 | 45 | 119 | 60 |
| BMU-26-071 | L1260-ORE-002-DBY-002 | 596553.9 | 5882794.6 | 1260.4 | 25 | 149 | 261.1 |
| BMU-26-082 | L1260-RMK-001 | 596552.3 | 5882850.8 | 1260.8 | 23 | 119 | 81.2 |
| BMU-26-083 | L1260-RMK-001 | 596551.8 | 5882850.4 | 1261.2 | 45 | 128 | 69.2 |
| BMU-26-084 | L1260-RMK-001 | 596551.9 | 5882850.4 | 1260.6 | 27 | 128 | 117 |
| BMU-26-085 | L1260-RMK-001 | 596552.8 | 5882851.2 | 1259.7 | -15 | 110 | 165 |
| BMU-26-086 | L1260-RMK-001 | 596552.9 | 5882851.3 | 1259.3 | -25 | 110 | 180.3 |
| BMU-26-087 | L1260-RMK-001 | 596552.4 | 5882851.2 | 1258.9 | -35 | 110 | 291.4 |
| BMU-26-088 | L1260-RMK-001 | 596552.1 | 5882850.6 | 1260.1 | 5 | 119 | 201.4 |
| BMU-26-089 | L1260-RMK-001 | 596552.2 | 5882850.5 | 1259.7 | -5 | 119 | 163.3 |
| BMU-26-090 | L1260-RMK-001 | 596552.3 | 5882850.4 | 1259.4 | -15 | 119 | 204.3 |
| BMU-26-091 | L1260-RMK-001 | 596552.2 | 5882850.5 | 1259.0 | -25 | 119 | 249.4 |
| BMU-26-092 | L1260-RMK-001 | 596552.1 | 5882850.5 | 1258.8 | -35 | 119 | 369.3 |
| BMU-26-103 | L1260-ORE-002-DBY-002 | 596554.1 | 5882794.3 | 1259.9 | 15 | 149 | 279.6 |
| BMU-26-104 | L1260-ORE-002-DBY-002 | 596554.1 | 5882794.3 | 1259.3 | 5 | 149 | 336.1 |
| BMU-26-105 | L1260-RMK-001 | 596551.9 | 5882850.4 | 1260.6 | 15 | 128 | 189.2 |
| BMU-26-106 | L1260-RMK-001 | 596551.9 | 5882850.4 | 1260.1 | 5 | 128 | 144.3 |
| BMU-26-107 | L1260-RMK-001 | 596552.1 | 5882850.1 | 1259.7 | -5 | 128 | 243.2 |
| BMU-26-108 | L1260-RMK-001 | 596552.1 | 5882850.2 | 1259.3 | -15 | 128 | 294.2 |
| BMU-26-109 | L1260-RMK-001 | 596552.0 | 5882850.2 | 1259.1 | -25 | 128 | 297.3 |
| BMU-26-110 | L1260-RMK-001 | 596552.0 | 5882850.2 | 1258.7 | -35 | 128 | 400.5 |
ABOUT CARIBOO GOLD PROJECT
The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project currently under construction located in the historic Wells-Barkerville mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company’s land package includes 443 mineral titles and covers an area that extends approximately 77 kilometres from northwest to southeast. In late 2024, the Project was granted the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process for key approvals. On September 14, 2026, the Company announced a formal positive decision to proceed with the construction of the Project, with an expected first gold pour in Q1 2029 and commercial production in H2 2029.
Technical Reports
Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project is supported by the technical report, titled “NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada” dated June 11, 2025 (with an effective date of April 25, 2025) (the “Cariboo Technical Report“).
For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein. The Cariboo Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Cariboo Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101“) and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Gold’s issuer profile and on the Company’s website at www.osiskogold.ca.
Qualified Persons
The scientific and technical information in this news release has been reviewed, verified and approved by Scott Smith, P. Geo., Vice President, Exploration of Osisko Gold, a “qualified person” within the meaning of NI 43-101. Verification includes review of core photographs and three-dimensional review of logged drillhole data and assays consistent with the Company’s standard procedures.
Quality Assurance (QA) – Quality Control (QC)
HQ and NQ diameter drill core is cut (halved) on-site at the Cariboo Project subsequent to QAQC checks for logging and sampling errors. BQ (limited to directional intervals) is whole core sampled following daily QAQC. Any BQ intercepts external to the footprint of the current resource (none herein) will be excluded from informing any new resource shapes. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. Samples are bagged, labelled, and sealed with numbered security tags.
All drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is independent of the Company and is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).
ABOUT OSISKO GOLD GROUP INC.
Osisko Gold Group Inc. is a North American gold development company focused on past-producing mining camps with district-scale potential. The Company’s objective is to become an intermediate gold producer through the development of its flagship, fully permitted, 100%-owned Cariboo Gold Project, currently under construction in central British Columbia, Canada. The Project is situated within the Company’s broader Cariboo regional land package, which hosts numerous prospective exploration targets and provides opportunities for future discoveries. Its Cariboo project pipeline is complemented by the Tintic Project, located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Gold is focused on developing long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk management, and mineral inventory growth.
For further information, visit our website at www.osiskogold.ca or contact:
| Sean Roosen | Philip Rabenok |
| Chairman and CEO | Vice President, Investor Relations |
| Email: [email protected] | Email: [email protected] |
| Tel: +1 (514) 940-0685 | Tel: +1 (437) 423-3644 |
CAUTION REGARDING FORWARD-LOOKING STATEMENTS
This news release contains “forward-looking information” (within the meaning of applicable Canadian securities laws) and “forward-looking statements” (within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, as amended) (collectively, “forward-looking statements”). Such forward-looking statements, by their nature, require Osisko Gold to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Such forward-looking statements are not guarantees of performance and are identified with words such as “may”, “will”, “would”, “could”, “expect”, “believe”, “plan”, “anticipate”, “intend”, “estimate”, “potential”, “propose”, “project”, “outlook”, “foresee”, “continue”, “objective”, “scheduled”, “target”, variants of these words or the negative or comparable terminology, as well as terms usually used in the future and the conditional. Forward-looking statements in this news release include, but are not limited to, statements pertaining to: the significance and interpretation of drilling results at Lowhee SE and Lowhee Deep, including the extension of high-grade mineralization along strike and below the current mineral resource, and the potential for near-mine resource growth at the Lowhee Zone, both laterally along strike and at depth (if any); the Company’s continued exploration in underexplored areas, including at Lowhee SE and Lowhee Deep, and the results and implications thereof (if any); the expected expansion of the Company’s understanding of the geological model, the exclusion of BQ drill core intercepts from informing any new resource shapes, and the identification of opportunities for future resource growth (if any); the expected retirement of Mr. Rouleau as Vice President, Project Development and the transition of project development responsibilities, including his availability in an advisory capacity; the continued construction of the Cariboo Gold Project and the expected timing of first gold pour and commercial production; the Cariboo Gold Project’s permitting status and the expected timing of receipt of remaining authorizations, permit amendments and construction permits; the Company’s objective of becoming an intermediate gold producer; and the exploration potential and potential for future discoveries (if any) on its properties. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including: the ability of drilling and sampling to accurately predict mineralization; the reliability of the interpretation of geological structure, vein orientation and continuity, including the estimated true widths and vertical depths of the reported intercepts and their position relative to the current mineral resource; the accuracy of the current mineral resource estimate and its underlying assumptions; results of further drilling being consistent with those to date; the availability of drill rigs and personnel; the orderly transition of project development responsibilities, including Mr. Rouleau’s continued availability in an advisory capacity; the Company’s ability to retain key personnel; construction proceeding on the anticipated schedule and within the estimated budget; the availability of personnel, contractors, equipment, supplies and infrastructure; required permits, authorizations and amendments being obtained and maintained in a timely manner; the continued support of First Nations and other stakeholders; the Company’s continued access to capital on acceptable terms; and the absence of material adverse changes in gold prices, foreign exchange rates and general economic and market conditions. Osisko Gold considers its assumptions to be reasonable based on information currently available but cautions the reader that its assumptions regarding future events, many of which are beyond the control of Osisko Gold, may ultimately prove to be incorrect since they are subject to risks and uncertainties that affect Osisko Gold and its business.
Such risks and uncertainties include, but are not limited to: the results of exploration activities, including the risk that further drilling does not confirm current interpretations or support resource growth; errors in management’s geological modelling, including the interpretation of geological structure, vein orientation and true widths; local variability of high-grade vein mineralization, including the risk that individual high-grade assays are not representative of the broader mineralized zone; risks relating to exploration, development and mining activities; risks associated with the development and construction of the Cariboo Gold Project, including construction delays, cost overruns, inflation and supply chain disruptions; the inability to retain key personnel and disruption associated with leadership changes, including the transition of project development responsibilities; labour shortages or disputes and health, safety and security incidents; risks relating to third-party approvals, including the issuance of permits by governments, favourable regulatory conditions and approvals, capital market conditions and the Company’s ability to access capital on terms acceptable to the Company for the contemplated exploration and development at the Company’s properties; regulatory framework and presence of laws and regulations that may impose restrictions on mining; the timing and ability of the Company to obtain and maintain required approvals and permits; the global economic climate; fluctuations in metal and commodity prices; fluctuations in the currency markets; environmental risks; and community, non-governmental and governmental actions, including relationships with First Nations, and the impact of stakeholder actions. Readers are urged to consult the disclosure provided under the heading “Risk Factors” in the Company’s annual information form for the year ended December 31, 2025 as well as those risks and factors disclosed in the Company’s most recent financial statements and management’s discussion and analysis and other public filings filed under Osisko Gold’s issuer profile on SEDAR+ (www.sedarplus.ca) and on the SEC’s EDGAR website (www.sec.gov), for further information regarding the risks and other factors facing the Company, its business and operations.
Although the Company believes the expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Readers are cautioned that the foregoing lists of assumptions, risks and uncertainties are not exhaustive. The forward-looking statements contained herein are made as of the date of this news release and, except as required by applicable law, the Company undertakes no obligation to update publicly or to revise any of the forward-looking statements, whether as a result of new information, future events or otherwise.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/2d786fb1-97b6-4acf-b7db-6484b6d7a91f
https://www.globenewswire.com/NewsRoom/AttachmentNg/b845cc4f-f7eb-455b-8223-6e856813ae59
https://www.globenewswire.com/NewsRoom/AttachmentNg/ca912e7e-2ef6-4c5a-b917-3857e481b63c
https://www.globenewswire.com/NewsRoom/AttachmentNg/99c0622c-a96e-4abc-9ef0-1c53814d1208
https://www.globenewswire.com/NewsRoom/AttachmentNg/71b5a223-1546-49c0-8544-4256eb8a1887
