{"id":391602,"date":"2020-12-02T08:03:20","date_gmt":"2020-12-02T13:03:20","guid":{"rendered":"http:\/\/www.marketnewsdesk.com\/?p=391602"},"modified":"2020-12-02T08:03:20","modified_gmt":"2020-12-02T13:03:20","slug":"sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study","status":"publish","type":"post","link":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/","title":{"rendered":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study"},"content":{"rendered":"<h2>\nCompletion Targeted for Q1 2021<br \/>\n<\/h2>\n<div class=\"mw_release\">\n<p align=\"justify\">VANCOUVER, British Columbia, Dec.  02, 2020  (GLOBE NEWSWIRE) &#8212; Sabina Gold &amp; Silver Corp (SBB.T\/SGSVF.OTCQX), (\u201cSabina\u201d or the \u201cCompany\u201d) is pleased to report on the status of the Updated Feasibility Study (\u201cUFS\u201d) on the proposed Goose Mine at its 100%-owned Back River Gold Project (\u201cBack River\u201d or the \u201cProject\u201d) in Nunavut, Canada.<\/p>\n<p align=\"justify\">\u201cWork continues to advance the updated Back River resource estimate and Goose Project UFS for delivery in Q1, 2021,\u201d said Bruce McLeod, President &amp; CEO.\u00a0 \u201cThe significant exploration success we have delivered since the September 2015 feasibility study has been incorporated into the resource estimate and mine plan, along with many other improvements to the Project.\u00a0\u00a0 This work continues to showcase the Goose Mine as a very compelling project: the first of many opportunities on Sabina\u2019s 80km long Back River belt.\u00a0 \u00a0Work continues at site, and we expect to complete our objectives for civil works to enable collaring our exploration decline in the spring of next year.\u00a0 We anticipate mobilizing out of camp in mid December.\u201d<\/p>\n<p align=\"justify\">\n        <strong><br \/>\n          <u>UPDATED FEASIBILITY STUDY<\/u><br \/>\n        <\/strong>\n      <\/p>\n<p align=\"justify\">\n        <strong>Introduction:<\/strong>\n      <\/p>\n<p align=\"justify\">The September 2015 feasibility study (\u201c2015 FS\u201d) envisioned a 3,000 tonne per day (\u201cTPD\u201d) mine producing approximately 200,000 ounces a year over an 11.8-year mine life from a series of three open pits and one underground at the Goose site.\u00a0 Since that time, material discoveries and significant resource extensions have been made at the Project, including the two separate high-grade underground zones at Umwelt.\u00a0 Internal studies were undertaken to determine what potential improvement these areas might have to meaningfully increase the production profile and\/or mine life, with a similar or marginally increased throughput, through a combination of open pit and underground mines at the Goose site.\u00a0 The Company is well advanced on the UFS which is expected in early Q1, 2021.\u00a0 The goal for the UFS is to increase gold production on an annual and total life of mine basis, which is expected to improve the overall financial metrics of the Project over the already positive economics demonstrated in the 2015 FS<\/p>\n<p align=\"justify\">\n        <strong>Resource:<\/strong>\n      <\/p>\n<p align=\"justify\">Since the last Back River resource statement was completed, Sabina has drilled over 50,000 meters at the Goose site.\u00a0 This drilling has resulted in several discoveries as well as expansion of the known mineralized horizons at the Project. \u00a0In 2020, exploration and infill drilling focused on areas that could positively impact the mine plan.\u00a0 Due to COVID, drilling to enable conversion to reserves was not achievable in 2020 for all of the new deposit areas.\u00a0 However, the new resource estimates will include updates to: Umwelt; Goose Main; Echo; and new inferred resources from the Nuvuyak and Llama Extension deposits.\u00a0 The George open pit resources will also be updated to reflect current metal price assumptions.<\/p>\n<p align=\"justify\">\n        <strong>Reserve, Mining methods and Market Studies:<\/strong>\n      <\/p>\n<p align=\"justify\">This Exploration success since the 2015 FS has enabled Sabina to re-envision the mine plan in the UFS. \u00a0With early access to the high grade V2 Zone located below the Umwelt open pit, Sabina will add high-grade underground feed to the process plant early in the mine life and recover more higher-grade reserves earlier than envisioned in the 2015 FS.\u00a0 The mine plan will incorporate cut and fill mining methods plus cemented rock in select areas of the interface between the open pit and underground deposits, enabling production from areas previously excluded.\u00a0 The mining sequence in the UFS mine plan compared to the 2015 FS is outlined below.<\/p>\n<p align=\"justify\">Table 1: UFS re-envisioned mine plan relative to the 2015 Feasibility Study<\/p>\n<table style=\"border-collapse: collapse;margin-right:6.75pt;width:100%;border-collapse:collapse\">\n<tr>\n<td colspan=\"2\" style=\"border-top: solid black 1pt;border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\n            <strong>Mine Production Plan Sequencing<\/strong>\n          <\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\n            <strong>2015 Feasibility Study<\/strong>\n          <\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\n            <strong>2021 UFS <\/strong>\n          <\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Umwelt Open Pit<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Echo Pit<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Llama Open Pit<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Umwelt Underground<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Goose Open Pit<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Umwelt Open Pit<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Umwelt Underground<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Llama Open Pit<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\u00a0<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Llama Underground<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\u00a0<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Goose Main Open Pit<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">\u00a0<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: center;vertical-align: middle;vertical-align: top\">Goose Main Underground<\/td>\n<\/tr>\n<\/table>\n<p align=\"justify\">A photo accompanying this announcement is available at <a href=\"https:\/\/www.globenewswire.com\/NewsRoom\/AttachmentNg\/444079fb-dfed-4046-a372-6458768b5b80\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">https:\/\/www.globenewswire.com\/NewsRoom\/AttachmentNg\/444079fb-dfed-4046-a372-6458768b5b80<\/a>\u00a0<\/p>\n<p align=\"justify\">\n        <strong>Processing, Test Work and Recoveries:<\/strong>\n      <\/p>\n<p align=\"justify\">Since the 2015 FS, Sabina has undertaken additional metallurgical test work programs which have provided better certainty to the process plant design.\u00a0 These programs included: secondary grinding; leach vs flotation; detox; gravity recovery; and tailings and water quality test work.\u00a0 Results have confirmed the process plant operating parameters as well modest improvements to our baseline recoveries for most deposits.\u00a0 The process plant is designed as a traditional 3,000 TPD, primary\/secondary\/tertiary crushing, primary\/secondary grinding, gravity separation, carbon-in-pulp, leach and detox plant.\u00a0 The plant has a design head grade between 6 and 12gpt with the capability to increase through-put in later years.<\/p>\n<p align=\"justify\">\n        <strong>Infrastructure:<\/strong>\n      <\/p>\n<p align=\"justify\">Sabina has made extensive improvements on all aspects of the Project scope.\u00a0 A brief outline of the significant improvements are as follows:<\/p>\n<ul type=\"disc\">\n<li>Inaugural winter ice road and sealifts completed, gaining logistical, operational and cost experience which will be incorporated into the UFS;<\/li>\n<li>Significant reduction in earthworks for water management structures, (particularly earthworks scheduled for winter construction in the 2015 FS), thus reducing overall Project execution and schedule risk;<\/li>\n<li>Larger accommodation complex for an increased work force which enables underground and surface mining operations to run concurrently with construction;<\/li>\n<li>Enclosed power plant with larger and fewer power units generating heat recovery providing additional reliability for the power supply during operations;<\/li>\n<li>Shorter tailings lines which will reduce operational risk;<\/li>\n<li>A Sabina owned, on site oxygen plant and laboratory versus the previous model contemplated; and<\/li>\n<li>Three years of on-site seasonal construction experience providing improved understanding of operating in our northern environment which will be applied to estimated costs.<\/li>\n<\/ul>\n<p align=\"justify\">\n        <strong>Environmental, Permitting and Social:<\/strong>\n      <\/p>\n<p align=\"justify\">The Company is now in receipt of all major authorizations for construction and operations. More recent significant advances in permitting include: the final Project Certificate, received on December 19, 2017; the Type A Water License, received on November 14, 2018; and the listing to enable deposition of tailings on Schedule 2 of the Metals and Diamond Mining Effluent Regulations, received on June 25, 2020.\u00a0 All project modifications were contemplated when the Company submitted its 2020 permit modification package to the regulatory authorities.\u00a0 Sabina continues to support the local communities within the region during COVID and continues to receive local support for the project.<\/p>\n<p align=\"justify\">\n        <strong>CAPEX, OPEX and Financial:<\/strong>\n      <\/p>\n<p align=\"justify\">Sabina is maintaining an initial nameplate throughput of 3,000 TPD in the UFS but the study will include an expansion to 4,000 TPD from sustaining capital in years four to five.\u00a0 As per the UFS guidelines, the team is achieving an AACE class III CAPEX estimate with the intention of converting to a class IV estimate for the process plant and selected aspects of remaining project scope after issuing the UFS.\u00a0 This will enable Sabina to obtain a fixed price proposal for construction execution.\u00a0 Completing the UFS while concurrently completing detail engineering will ensure details typically unrealized during a traditional feasibility study will be accurately represented and contribute to the overall accuracy of the study.\u00a0 The CAPEX and OPEX are being built up from first principles to reflect an updated execution strategy of a modified EPCM with Sabina self-managing as the Company has over the last three years.\u00a0 The inclusion of early underground mining activity along with price escalation and inflation, is expected to increase the overall CAPEX and OPEX when compared to the 2015 FS.\u00a0 The impact of an increased gold price and higher recovered ounces on an annual and life of mine basis are expected to improve the project economics when compared to the 2015 FS.<\/p>\n<p align=\"justify\">\n        <strong>Timeline:<\/strong>\n      <\/p>\n<p align=\"justify\">Sacr\u00e9-Davey Engineering Inc., currently heading detail engineering, will be the overall author with the following companies contributing to the UFS.<\/p>\n<table style=\"border-collapse: collapse;width:100%;border-collapse:collapse\">\n<tr>\n<td style=\"border-top: solid black 1pt;border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">\n            <strong>Firm<\/strong>\n          <\/td>\n<td style=\"border-top: solid black 1pt;border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">\n            <strong>Area of responsibility<\/strong>\n          <\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">AMC Consultants<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Resource Estimate<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">\n            <em>Knight Pi\u00e9sold <\/em><br \/>\n            <em>Consulting<\/em>\n          <\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Geo-mechanical &amp; Site water management Studies<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Caneco<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Process Plant and Metallurgy<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">SRK Consulting<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Water management Structures<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Mining Plus<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Mining updates<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">DT Engineers<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Balance of Plant Engineering<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">CGT Industrial Ltd<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Construction estimates<\/td>\n<\/tr>\n<tr>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;border-left: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">ALS &amp; BaseMet lab<\/td>\n<td style=\"border-right: solid black 1pt;border-bottom: solid black 1pt;text-align: justify;vertical-align: middle;vertical-align: top\">Environmental and mineral processing lab works<\/td>\n<\/tr>\n<\/table>\n<p align=\"justify\">Sabina is working with Sacr\u00e9-Davey Engineering Inc. and the other QP\u2019s for delivery of the UFS in early Q1 2021 and detailed engineering to 90% by the end of Q1 2021.<\/p>\n<p align=\"justify\">\n        <strong><br \/>\n          <u>Sabina Gold &amp; Silver Corp.<\/u><br \/>\n        <\/strong>\n      <\/p>\n<p align=\"justify\">Sabina Gold &amp; Silver Corp. is well-financed and is an emerging precious metals company with district scale, advanced, high grade gold assets in one of the world\u2019s newest, politically stable mining jurisdictions: Nunavut, Canada.<\/p>\n<p align=\"justify\">Sabina released a Feasibility Study on its 100% owned Back River Gold Project which presents a project that has been designed on a fit-for purpose basis, with the potential to produce ~200,000 ounces a year for ~11 years with a rapid payback of 2.9 years (see \u201cTechnical Report for the Initial Project Feasibility Study on the Back River Gold Property, Nunavut, Canada\u201d dated October 28, 2015).\u00a0<\/p>\n<p align=\"justify\">The Project received its final Project Certificate on December 19, 2017.\u00a0\u00a0 The Project received its Type A Water License on November 14, 2018 and its listing to enable deposition of tailings on Schedule 2 of the Metals and Diamond Mining Effluent Regulations on June 25, 2020.\u00a0 The Company is now in receipt of all major authorizations for construction and operations.<\/p>\n<p align=\"justify\">In addition to Back River, Sabina also owns a significant silver royalty on Glencore\u2019s Hackett River Project.\u00a0 The silver royalty on Hackett River\u2019s silver production is comprised of 22.5% of the first 190 million ounces produced and 12.5% of all silver produced thereafter.<\/p>\n<p align=\"justify\">For further information please contact:<\/p>\n<p align=\"justify\">Nicole Hoeller, Vice-President, Communications: <strong>1 888 648-4218 <\/strong><br \/><strong><u><a href=\"mailto:nhoeller@sabinagoldsilver.com\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">nhoeller@sabinagoldsilver.com<\/a><\/u><\/strong><\/p>\n<p align=\"justify\">\n        <strong>Forward Looking Information<\/strong><br \/>\n        <br \/>This news release contains \u201cforward-looking information\u201d within the meaning of applicable securities laws (the \u201cforward-looking statements\u201d), including our belief as to the extent, results and timing of and various studies relating to engineering studies, infrastructure improvement activities, exploration results and permitting and licensing outcomes. These forward-looking statements are made as of the date of this news release. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While we have based these forward-looking statements on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements. Such factors and assumptions include, among others, the effects of general economic conditions, commodity prices, changing foreign exchange rates and actions by government and regulatory authorities and misjudgments in the course of preparing forward-looking statements. In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with exploration and project development; the need for additional financing; the calculation of mineral resources and reserves; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; government regulation; obtaining and renewing necessary licenses and permits; environmental liability and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers or directors; the absence of dividends; currency fluctuations; labour disputes; competition; dilution; the volatility of the our common share price and volume; future sales of shares by existing shareholders; and other risks and uncertainties, including those relating to the Back River Project and general risks associated with the mineral exploration and development industry described in our Annual Information Form, financial statements and MD&amp;A for the fiscal period ended December 31, 2019 filed with the Canadian Securities Administrators and available at www.sedar.com. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws. This news release has been authorized by the undersigned on behalf of Sabina Gold &amp; Silver Corp.<\/p>\n<p align=\"center\">Bruce McLeod, President &amp; CEO<br \/>Suite 1800 \u2013 Two Bentall Centre<br \/>555 Burrard Street<br \/>Vancouver, BC V7X 1M7<br \/>Tel 604 998-4175\u00a0\u00a0\u00a0\u00a0 Fax 604 998-1051<br \/><strong><u><a href=\"http:\/\/www.sabinagoldsilver.com\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">http:\/\/www.sabinagoldsilver.com<\/a><\/u><\/strong>\u00a0<\/p>\n<p>      <img loading=\"lazy\" decoding=\"async\" class=\"__GNW8366DE3E__IMG\" src=\"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\" width=\"1\" height=\"1\" \/><br \/>\n      <br \/>\n      <img loading=\"lazy\" decoding=\"async\" class=\"__GNW8366DE3E__IMG\" src=\"https:\/\/ml.globenewswire.com\/release\/track\/32ee85de-70e9-4f5d-812c-565cd6f920bf\" width=\"1\" height=\"1\" \/>\n    <\/div>\n<div class=\"mw_contactinfo\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Completion Targeted for Q1 2021 VANCOUVER, British Columbia, Dec. 02, 2020 (GLOBE NEWSWIRE) &#8212; Sabina Gold &amp; Silver Corp (SBB.T\/SGSVF.OTCQX), (\u201cSabina\u201d or the \u201cCompany\u201d) is pleased to report on the status of the Updated Feasibility Study (\u201cUFS\u201d) on the proposed Goose Mine at its 100%-owned Back River Gold Project (\u201cBack River\u201d or the \u201cProject\u201d) in Nunavut, Canada. \u201cWork continues to advance the updated Back River resource estimate and Goose Project UFS for delivery in Q1, 2021,\u201d said Bruce McLeod, President &amp; CEO.\u00a0 \u201cThe significant exploration success we have delivered since the September 2015 feasibility study has been incorporated into the resource estimate and mine plan, along with many other improvements to the Project.\u00a0\u00a0 This work continues to showcase the Goose &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-391602","post","type-post","status-publish","format-standard","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk\" \/>\n<meta property=\"og:description\" content=\"Completion Targeted for Q1 2021 VANCOUVER, British Columbia, Dec. 02, 2020 (GLOBE NEWSWIRE) &#8212; Sabina Gold &amp; Silver Corp (SBB.T\/SGSVF.OTCQX), (\u201cSabina\u201d or the \u201cCompany\u201d) is pleased to report on the status of the Updated Feasibility Study (\u201cUFS\u201d) on the proposed Goose Mine at its 100%-owned Back River Gold Project (\u201cBack River\u201d or the \u201cProject\u201d) in Nunavut, Canada. \u201cWork continues to advance the updated Back River resource estimate and Goose Project UFS for delivery in Q1, 2021,\u201d said Bruce McLeod, President &amp; CEO.\u00a0 \u201cThe significant exploration success we have delivered since the September 2015 feasibility study has been incorporated into the resource estimate and mine plan, along with many other improvements to the Project.\u00a0\u00a0 This work continues to showcase the Goose &hellip; Continue reading &quot;Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study&quot;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/\" \/>\n<meta property=\"og:site_name\" content=\"Market Newsdesk\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-02T13:03:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\" \/>\n<meta name=\"author\" content=\"Newsdesk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Newsdesk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/\"},\"author\":{\"name\":\"Newsdesk\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/#\\\/schema\\\/person\\\/482f27a394d4fda80ecb5499e519d979\"},\"headline\":\"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study\",\"datePublished\":\"2020-12-02T13:03:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/\"},\"wordCount\":2043,\"image\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.globenewswire.com\\\/newsroom\\\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/\",\"url\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/\",\"name\":\"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.globenewswire.com\\\/newsroom\\\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\",\"datePublished\":\"2020-12-02T13:03:20+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/#\\\/schema\\\/person\\\/482f27a394d4fda80ecb5499e519d979\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.globenewswire.com\\\/newsroom\\\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\",\"contentUrl\":\"https:\\\/\\\/www.globenewswire.com\\\/newsroom\\\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/#website\",\"url\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/\",\"name\":\"Market Newsdesk\",\"description\":\"Latest Business News in Real Time\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/#\\\/schema\\\/person\\\/482f27a394d4fda80ecb5499e519d979\",\"name\":\"Newsdesk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g\",\"caption\":\"Newsdesk\"},\"url\":\"https:\\\/\\\/www.marketnewsdesk.com\\\/index.php\\\/author\\\/newsdesk\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/","og_locale":"en_US","og_type":"article","og_title":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk","og_description":"Completion Targeted for Q1 2021 VANCOUVER, British Columbia, Dec. 02, 2020 (GLOBE NEWSWIRE) &#8212; Sabina Gold &amp; Silver Corp (SBB.T\/SGSVF.OTCQX), (\u201cSabina\u201d or the \u201cCompany\u201d) is pleased to report on the status of the Updated Feasibility Study (\u201cUFS\u201d) on the proposed Goose Mine at its 100%-owned Back River Gold Project (\u201cBack River\u201d or the \u201cProject\u201d) in Nunavut, Canada. \u201cWork continues to advance the updated Back River resource estimate and Goose Project UFS for delivery in Q1, 2021,\u201d said Bruce McLeod, President &amp; CEO.\u00a0 \u201cThe significant exploration success we have delivered since the September 2015 feasibility study has been incorporated into the resource estimate and mine plan, along with many other improvements to the Project.\u00a0\u00a0 This work continues to showcase the Goose &hellip; Continue reading \"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study\"","og_url":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/","og_site_name":"Market Newsdesk","article_published_time":"2020-12-02T13:03:20+00:00","og_image":[{"url":"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=","type":"","width":"","height":""}],"author":"Newsdesk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Newsdesk","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#article","isPartOf":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/"},"author":{"name":"Newsdesk","@id":"https:\/\/www.marketnewsdesk.com\/#\/schema\/person\/482f27a394d4fda80ecb5499e519d979"},"headline":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study","datePublished":"2020-12-02T13:03:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/"},"wordCount":2043,"image":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#primaryimage"},"thumbnailUrl":"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/","url":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/","name":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study - Market Newsdesk","isPartOf":{"@id":"https:\/\/www.marketnewsdesk.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#primaryimage"},"image":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#primaryimage"},"thumbnailUrl":"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=","datePublished":"2020-12-02T13:03:20+00:00","author":{"@id":"https:\/\/www.marketnewsdesk.com\/#\/schema\/person\/482f27a394d4fda80ecb5499e519d979"},"breadcrumb":{"@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#primaryimage","url":"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA=","contentUrl":"https:\/\/www.globenewswire.com\/newsroom\/ti?nf=ODA5NTI5NiMzODUyMzkzIzIwOTE0NTA="},{"@type":"BreadcrumbList","@id":"https:\/\/www.marketnewsdesk.com\/index.php\/sabina-gold-silver-corp-makes-good-progress-on-updated-feasibility-study\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.marketnewsdesk.com\/"},{"@type":"ListItem","position":2,"name":"Sabina Gold &amp; Silver Corp. Makes Good Progress on Updated Feasibility Study"}]},{"@type":"WebSite","@id":"https:\/\/www.marketnewsdesk.com\/#website","url":"https:\/\/www.marketnewsdesk.com\/","name":"Market Newsdesk","description":"Latest Business News in Real Time","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.marketnewsdesk.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.marketnewsdesk.com\/#\/schema\/person\/482f27a394d4fda80ecb5499e519d979","name":"Newsdesk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a0d0bd5b0f0ca12a265a459b13169dac35f33776d8501eda5e68844a366f2f46?s=96&d=mm&r=g","caption":"Newsdesk"},"url":"https:\/\/www.marketnewsdesk.com\/index.php\/author\/newsdesk\/"}]}},"_links":{"self":[{"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/posts\/391602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/comments?post=391602"}],"version-history":[{"count":0,"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/posts\/391602\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/media?parent=391602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/categories?post=391602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marketnewsdesk.com\/index.php\/wp-json\/wp\/v2\/tags?post=391602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}